PRESS DIGEST 7 JUN 2026: MEX’s EV Olinia 1; Monterrey airport power outage

MONTERREY, MEXICO (By editors with Energy Analytics Institute, 7.Jun.2026, Words: 208) — The following briefs are compiled from varied media outlets across the Latin America and Caribbean (LAC) region and beyond and span company details on the CFE, the National Technological Institute of Mexico (TecNM) and the National Polytechnic Institute (IPN), among others.

Energy Analytics Institute (EAI) has not verified all of these stories and therefore does not vouch for their accuracy. 

LATIN AMERIA AND THE CARIBBEAN

— Olinia Cargo, an electric vehicle designed for transporting goods, will be presented next mth, according to Olinia project director Roberto Capuano Tripp.

RELATED: MEXICO REVEALS “MADE IN MEXICO” EV OLINIA 1

— users of Monterrey Airport reported a power outage left all 3 terminals w/o electricity. According to El Norte, users stated that before the blackout, a loud bang was heard outside the airport terminal, near the construction site of Metro Line 6. Reports from people at the airport indicate that the cause of the outage was an explosion in a transformer located outside the airport.

____________________

By editors at Energy Analytics Institute (EAI) reporting from Atlanta, Baton Rouge, Caracas, Houston, Monterrey, Mexico City, Panama City, and Bogota. Energy Analytics Institute (EAI) does not provide investment advice. Â© 1999-2026 Energy Analytics Institute (EAI). All Rights Reserved.