Touchstone updates on Carapal Ridge 3, Cascadura and WD-8 blk

PANAMA CITY, PANAMA (By Piero Stewart, Energy Analytics Institute, 15.May.2026, Words: 300) — Touchstone Exploration Inc. updated on its ongoing activities in Trinidad and Tobago spanning from the Carapal Ridge 3 (CR-3) to the Cascadura infrastructure, and oil block drilling (WD-8).

In specific, the Calgary, Alberta-based company said it successfully delivered the Cascadura compressor to its facility in Apr. 2026, with commissioning expected in Jun. 2026 to unlock further production capacity. Touchstone added it completed drilling the FR-1836 well (WD-8 block) ahead of schedule, with the well encountering an estimated 227ft of net hydrocarbon pay.Â