BOGOTÁ, COLOMBIA (By Ana Sanches, Editores Latin Petroleum, 13.Aug.2026, Words: 325) — Orvana Minerals Corp. completed commissioning of crushing, milling, thickening, acid leaching, filtration (source of both copper PLS-pregnant leach solution and gold-silver cake), copper cathodes circuit (SX-EW), and gold-silver dore circuit (CN leach plus ADR).
With the production of copper PLS and gold-silver cake established in Jul. 2026, ramp-up activities across the copper and precious metals circuits are currently progressing in Aug. 2026, as planned, Orvana said on 13 Aug. 2026 in an official statement.