(Energy Analytics Institute, 28.Oct.2020) — EP PetroEcuador finalized scheduled maintenance at the Shushufindi Gas Plant located in the Sucumbíos province.
Work activities took place over 14 days and included an integral revision of the rotating and static equipment at the plant to guarantee operational safety and maintain production at its maximum capacity.
In accordance with the multi-year schedule, maintenance at the gas plant and capture stations is carried out every two years, PetroEcuador announced on 28 October 2020 in an official statement.
__________
By Piero Stewart. © Energy Analytics Institute (EAI). All Rights Reserved.