BOGOTÁ, COLOMBIA (By Ana Sanches, Energy Analytics Institute, 10.Aug.2026, Words: 196) — The Hilli Episeyo is beginning its final preparations before arriving in the San Matías Gulf.
This, after 8 years of operation in Cameroon, the Golar LNG vessel departed for Singapore, where it will be refurbished before arriving in Río Negro in 2027, according to Energia360.