HOUSTON, TEXAS (By Isaac Silvestre, Energy Analytics Institute, 1.Aug.2025, Words: 236) — ExxonMobil Corporation expects the arrival next week of its fourth floating production, storage and offloading (FPSO) vessel offshore Guyana, and this time for the Yellowtail development.
Importantly, 4 more FPSOs are still planned by the end of 2030, which will allow ExxonMobil to boost gross production capacity to offshore Guyana in the prolific Stabroek bloc to 1.7 million oil-equivalent barrels per day (MMboe/d).