HOUSTON, TEXASÂ (By Pietro D. Pitts, Energy Analytics Institute, 31.Jul.2026, Words: 154) â ExxonMobil said production in Guyana in the third quarter 2026 will be lower owing to entitlement volumes.
FROM THE LATINPETROLEUM ARCHIVES: RELATED POSTS
New Wave Offshore Energy to Conduct MWS for ExxonMobil’s Whiptail Project Offshore Guyana
- ENERGY ANALYTICS INSTITUTE (EAI)
- 03/13/2025
- 0
PANAMA CITY, PANAMA (Piero Stewart, Energy Analytics Institute, 13.Mar.2025) â New Wave Offshore Energy has been selected to conduct the Marine Warranty Survey (MWS) for ExxonMobil Guyana‘s $12.7bn Whiptail development in the Stabroek block offshore Guyana. The MWS contract encompasses risk management and safety oversight support for the project, which […]
ExxonMobil says 4th FPSO offshore Guyana related to Yellowtail arrives next week
- ENERGY ANALYTICS INSTITUTE (EAI)
- 08/01/2025
- 0
HOUSTON, TEXAS (By Isaac Silvestre, Energy Analytics Institute, 1.Aug.2025, Words: 236) â ExxonMobil Corporation expects the arrival next week of its fourth floating production, storage and offloading (FPSO) vessel offshore Guyana, and this time for the Yellowtail development. Importantly, 4 more FPSOs are still planned by the end of 2030, […]
Hess Says Liza Destiny FPSO Arrives Offshore Guyana
- ENERGY ANALYTICS INSTITUTE (EAI)
- 08/29/2019
- 0
(Hess, 29.Aug.2019) â Hess Corporation announced that the Liza Destiny, Guyanaâs first oil production vessel, has arrived at the Stabroek Block. The Floating, Production, Storage and Offloading (FPSO) vessel arrived following a 42 day journey from Singapore. This FPSO is a significant component of the Liza Phase 1 development, which […]