Guyana: RFP for NGL Plant, 300MW CCGT Power Plant Project

Instant Max AI

(Guyana’s Ministry of Natural Resources, 8.Jul.2022) — The Ministry of Natural Resources (MNR) invites eligible Consultancy Firms to submit Proposals for Project Management Consultant for the Integrated NGL Plant and 300MW CCGT Power Plant Project.

The main objective of this Consultancy is for the Consultant to assist the Government of Guyana through the Gas to Energy Task Force in the design review, construction supervision and general project management of the development of the integrated plants, and contract administration throughout the project implementation process and thereafter during the defects liability period.

The estimated duration of the project is 42 calendar months from the date of Contract signing and at least 12 months thereafter for defects liability from a date to be determined.

Consultants will be selected in accordance with the policies and procedures set out by the National Procurement Act (2003). The Standard Request for Proposal document can be found on the Ministry’s website (www.nre.gov.gy) from 3 July 2022.

____________________

Previous post Petrobras to Host 2Q:22 Results Calls
Next post Guyana Ready to Make Investment Decisions with Saudi Arabia