BOGOTÁ, COLOMBIA (By Ana Sanches, Energy Analytics Institute, 9.Jul.2026, Words: 271) — Ecuador’s Ministry of Environment and Energy (MAE) and the Ecuadorian Electricity Corporation (CELEC EP) jointly carried out major, preventive, and corrective maintenance work at the Sacha, Cuyabeno, and Shushufindi thermoelectric power plants.
Said plants are part of the interconnected oil electrical system (SEIP) and guarantee operation of the oil fields operated by EP Petroecuador in the Amazon.