HOUSTON, TEXAS (Editors at Energy Analytics Institute, 20.Jan.2025) — First Mining Gold Corp. announced new drilling results from the 2024 Phase 3 diamond drilling program at its Duparquet Gold Project located in Quebec, Canada where it as identified 2 new discovery gold zones during the expansion drilling at the Valentre target.
Assay results for the newly discovered “Miroir Zone”, located north of the Valentre target, returned 3.12 g/t Au over 19.35m, including 5.47 g/t Au over 9.6m, the company said 20 Jan. 2025 in an official statement.
Further drill results from the program identified a second discovery, the “Aiguille Zone”, occurring south of the Valentre target, returning 8.99 g/t Au over 3.1 m.
In total, 142 unique mineralized intercepts in 16 drill holes have been encountered in the Valentre expansion area, including the new discoveries at Miroir and Aiguille. These new drill results support a strong continuity in mineralization within the Central Duparquet, Valentre and Dumico (CVD) area, while highlighting an affinity for additional discovery zones with increasing exploration at the Duparquet Project.
____________________
By Editors at Energy Analytics Institute. © 2025 Energy Analytics Institute (EAI). All Rights Reserved.