(Wood, 8.Jan.2023) — Wood, a global consulting and engineering, has secured a contract from HD Hyundai Heavy Industries for detailed engineering of the topsides facilities on Woodside Energy's Trion Floating...
(TechnipFMC, 5.Jul.2022) — TechnipFMC (NYSE: FTI) has signed a Letter of Intent with Equinor Energy do Brazil Ltda., a subsidiary of Equinor ASA, for an integrated Front End Engineering and...
(Subsea 7, 11.May.2022) — Subsea 7 announced the award of a sizeable(1) project by BP for the TOPR project located offshore Trinidad and Tobago, in water depths of up to 280...
(Equinor, 10.Nov.2020) — Equinor has, on behalf of the partners ExxonMobil and Petrogal Brasil, awarded Baker Hughes, Halliburton and Schlumberger contracts for drilling and well services on the Bacalhau field...
(McDermott, 26.Aug.2020) — McDermott International Ltd. today announced it has been awarded a contract by Delta Offshore Energy to provide front-end engineering design (FEED) services for a subsea gas pipeline....
(McDermott, 14.Jul.2020) — McDermott International Ltd. announced it has been awarded a *large engineering and procurement contract from Azikel Petroleum Ltd. for the modular 12,000 BPD Hydro-Skimming Refinery project. The...
(McDermott, 18.May.2020) — McDermott International, Inc. today announced it has been awarded a sizeable* contract from a Middle East customer to carry out front-end engineering and design (FEED) work for...
(McDermott, 30.Mar.2020) — McDermott International, Inc. has been awarded a sizeable* contract by BHP Billiton Petróleo Operaciones de México, S. De R.L. De C.V. (BHP) to provide pre-front-end engineering design...
(Schlumberger, 30.Jan.2020) — Schlumberger announced an award to Subsea Integration Alliance of an exclusive contract by Equinor for the front-end engineering design (FEED) on its Bacalhau (formerly Carcará) project offshore...
(Equinor, 30.Jan.2020) — Equinor has, on behalf of the partners ExxonMobil and Petrogal Brasil entered into Front End Engineering and Design (FEED) contracts with early commitments and pre-investments for phase...
(Total, 16.Dec.2019) — Total announces the final investment decision (FID) to develop the Anchor oil field. Additionally, front-end engineering and design (FEED) has begun for the North Platte discovery. Both...
(KBR, 28.Feb.2019) — KBR, Inc. has been awarded a pre Front End Engineering Design (Pre-FEED) contract by Mexico Pacific Limited (MPL) for a midscale LNG liquefaction project in Puerto Libertad...
(McDermott, 15.Nov.2018) — McDermott International, Inc. announced a contract award for concept and engineering services for Talos Energy Inc. for the Zama field development project – the first offshore Mexico...