(Argus, 21.Jun.2019) — Trinidad and Tobago’s LNG producer Atlantic resumed operations today at its four-train 14.8mn t/yr liquefaction facility after a five-day shutdown caused by a power cut. The trains are being re-fired “progressively” and will eventually be brought up to full capacity, Atlantic told Argus, without indicating when optimum […]