PANAMA CITY, PANAMA (By Piero Stewart, Energy Analytics Institute, 7.Jul.2025, Words: 396) — Touchstone Exploration Inc., which spud the Cascadura-5 (Cas-5) development well on 4 Jun. 2025, has cased the well for future production following open-hole logging operations.
Cas-5 was drilled using the Star Valley Drilling Rig #205 and to a total depth (TD) of 7,020ft over 22 days.