Petrobras Ends Testing At LNG Regasification Terminal
(Petrobras, 17.Sep.2020) — Petrobras successfully concluded the operation test with an flowrate of 30 MMm3/day (millions of cubic meters per day) of natural gas, held at the Guanabara Bay (TR-BGUA)...