EP PetroEcuador Performs Maintenance To Monoboya X

Instant Max AI

(Energy Analytics Institute, Piero Stewart, 26.Feb.2019) — EP Petroecuador, within the preventive maintenance plan for its offshore installations, carried out work related to changing a 42-inch off buoy hose along the Monoboya X cargo line, which is part of the Balao Maritime Terminal, the state entity announced in an official statement.

Workers changing the hose in Ecuador. Source: EP PetroEcuador

The monoboya, anchored some 7.2 km from the shore, is capable of simultaneously loading tankers of up to 100,000 tons (dead-weight) or 700,000 barrels of crude oil.

***

© Energy Analytics Institute (EAI)

Previous post Petrobras BODs Approves Nomination Of Member Of The Board
Next post Lure Of Guyana’s Energy Rents

Leave a Reply

Your email address will not be published.