OSLO, NORWAY (By Equinor, 18,.Nov.2025, Words: 748) — Equinor’s investigation identifies venting from the MEG tanks as the main source causing the exposure incidents and that several factors have occurred simultaneously for the events to happen. Wind conditions caused the gas to descend to ground level, where personnel were working. […]
Tag: Hammerfest LNG
EAI brief: Norway’s Equinor investigating working conditions at Hammerfest LNG (HLNG)
HOUSTON, TEXAS (By Editors at Energy Analytics Institute, 16.Jul.2025, Words: 168) — Norway’s Equinor opened 2 internal investigations at Hammerfest LNG (HLNG) during the second-quarter 2025 (2Q:25). Norway is an important gas supplier to Europe, and the volumes from HLNG account for over 5% of Norwegian gas exports.Â
Norway’s Equinor reveals start of production at Hammerfest LNG
OSLO, NORWAY (By Equinor, 2.Jun.2022, Words: 569) — After extensive repairs and improvement work, Hammerfest LNG is back in production after the fire in September 2020. The first liquified natural gas (LNG) is now on tank at Melkøya. “With the start-up of Hammerfest LNG, we add further volume to the […]