HOUSTON, TEXAS (Editors at Energy Analytics Institute, 14.May.2025, Words: 307) — Woodside Energy said the Scarborough Energy project, which is now over 82% complete, achieved a major engineering milestone with the joining together of the topsides and hull for the floating production unit (FPU).  Constructed separately at 2 different fabrication […]