NRGBriefs: Bolivia’s Urea Exports to Argentina, Brazil, and Peru

Instant Max AI Immediate Frontier

(Energy Analytics Institute, 6.Jan.2022) — Energy briefs including Bolivia’s urea production gaining mkt shr in Argentina, Brazil and Peru in less than 4 mths; Chile building more than 6,600MW of renewable, solar and wind energy in 2021; EP PetroEcuador lifting force majeure after completing work on bypasses at the Trans-Ecuadorian Pipeline System (SOTE) and the Shushufindi-Quito Products Pipeline in Napo province; Weatherford joining up w/ Gas Storage Denmark to investigate potential leadages within the caprock of their gas storage facility near Stenlille; and more.

LATIN AMERICA AND THE CARIBBEAN

Bolivia

— Bolivia’s ammonia and urea plant has sold 26,490 tons into the domestic mkt in Iess than 4 mths, generating economic income of more than $14.38mn, state owned YPFB announced 6 Jan 2022 over social media. Internationally, Bolivia’s urea production has gained mkt shr in Brazil, Argentina and Peru in less than 4 mths. More than 60,000 tons has been commercialized during the timeframe, generating income of more than $37.22mn.

Chile

— In 2021, more than 6,600MW of renewable, solar and wind energy were built and went into operation in Chile, the country’s Energy Ministry announced 6 Jan. 2022 over Instagram, adding the figures were equivalent to everything that has been built in its history.

ENAP’s Posesión Plant is currently working at a rate of 4.5 MMcm/d and is expected to reach a level of 7.2 MMcm/d, the co. said 6 Jan. 2022 over Instagram w/o providing a timeframe for the latter figure.

Ecuador

EP PetroEcuador lifted a force majeure announced in early Dec. 2021 after completing work on bypasses to the Trans-Ecuadorian Pipeline System (SOTE) and the Shushufindi-Quito Products Pipeline in Napo province, the co.’s General Manager Italo Cedeño confirmed 6 Jan. 2022 over social media. “We have resumed crude export loads… and will export 720,000 bbls of Napo crude and a similar figure for Oriente crude,” Cedeño said.

EUROPE

Denmark

Weatherford teamed up w/ Gas Storage Denmark to investigate potential leadages within the caprock of their gas storage facility near Stenlille. Despite a long, cold wk of ops, all wireline procedures went smoothly, including follow-up screens that verified no gas/water comingling within the reservoir, Weatherford announced 6 Jan. 2022 over Instagram.

ASIA

Singapore

— Integration of the Vito Regional Production Facility (Vito RPF) topside structure w/ its hull was performed safely and efficiently in a single lift – enabled by Tuas Boulevard Yard’s game-changing 30,000-tonne lifting capacity goliath cranes, Sembcorp Marine Ltd said 6 Jan. 2022 in an official stmt.

RELATED STORY: Sembcorp Marine Completes First Floating Production Unit Newbuild – the Vito Regional Production Facility

____________________

By Ian Silverman, Aaron Simonsky and Piero Stewart. © Energy Analytics Institute (EAI). All Rights Reserved.

Previous post Sembcorp Marine Completes First Floating Production Unit Newbuild
Next post New GM Electric Truck Faces Competition and Sceptical Buyers