Geronimo And Basin Electric Power Announce Deal

Immediate Frontier

(Geronimo 18.Feb.2020) — Geronimo Energy, a National Grid company, and Basin Electric Power Cooperative (Basin Electric) announced execution of a Power Purchase Agreement (PPA) for the Wild Springs Solar Project (Wild Springs). Wild Springs is a 128 megawatt (MW) clean solar energy project located in Pennington County, South Dakota, approximately 20 miles east of Rapid City. Wild Springs is anticipated to begin operations in 2022. Using the EPA’s greenhouse gas equivalencies calculator, the project is estimated to offset carbon dioxide emissions by 190,000 metric tons annually.

Once operational, Wild Springs will be the largest solar project in South Dakota. It will be located in the service area of West River Electric Association, Inc. (West River Electric), which is a distribution electric cooperative member of Basin Electric. In total, Basin Electric is a not-for-profit wholesale power provider to 141 member cooperative systems in nine states. In South Dakota, Basin Electric transmits its power supply to two generation and transmission (G&T) cooperatives, Rushmore Electric Power Cooperative (Rushmore Electric) and East River Electric Power Cooperative. Those two G&T cooperatives then transmit the power supply to their respective distribution cooperatives, with Rushmore Electric being the G&T provider to West River Electric. West River Electric and the state’s 27 other distribution co-ops power the homes, farms and businesses within their service areas.

***

Previous post Frontera Reports Growth In Value Of Reserves
Next post Talos Energy Announces 2020 Operating Guidance

One thought on “Geronimo And Basin Electric Power Announce Deal

  1. Atualmente, o software de controle remoto é usado principalmente na área de escritório, com funções básicas como transferência remota de arquivos e modificação de documentos.

Leave a Reply

Your email address will not be published.