Peregrino Module Sails to Brazilian Platform

(Energy Voice, David McPhee, 31.Jul.2018) – Watch as Equinor’s Peregrino modules set sail en route to the platform in Brazil to begin Phase 2 of the project.

Watch: Equinor Peregrino modules sail to Brazilian platform

The modules for the drilling facility have already been delivered but will now undergo stacking and testing.

Equinor said today that the platform and corresponding drilling facility will see installation in late 2019.

The offshore structure is set to begin production in 2020 and will produce for 20 years.

***

Author: ENERGY ANALYTICS INSTITUTE (EAI)

Energy Analytics Institute (EAI) is a Houston-based independent think-tank providing unbiased research, analysis, commentaries, opinions and breaking news related to the petroleum sectors in the Latin American and Caribbean regions.

Leave a Reply

Your email address will not be published. Required fields are marked *