Ninacaca Supply Plant To Be Build With 100% Local Labor

Instant Max AI

(Energy Analytics Institute, Ian Silverman, 23.Jan.2019) — Construction of the New Ninacaca Supply Plant in Peru will be comprised 100% of an unskilled labor force from Pasco.

The plant will be constructed on more than 121 square meters of land, and have a storage capacity of 7,500 barrels of three fuels: diesel B5, 90 octane gasoline and 84 octane gasoline.

Additionally, the plant will include 6,104 barrels of water for its fire system, which includes: motor pumps, a tank, a pipe network, sprinklers, monitors, hydrants, detectors, fire extinguishers, as well as water and foam systems, announced PetroPerú in an official statement.

***

© Energy Analytics Institute (EAI)

Previous post Nicolas Maduro Says U.S. Interested In Venezuela’s Oil, Gold, And Gas
Next post Venezuela Oil Sanctions Likely to Hit Some U.S. Refiners Hard

Leave a Reply

Your email address will not be published.